Install small wires for cell balancing, and larger negative cable for battery output from the BMS. Select a quality BMS that monitors over current, over and under voltage, charging rate, discharge rate, low and high temperature of cell surface and battery terminal, and State of Charge (SOC).
Fortress Lithium Battery issafe, easy to install, consistently reliable, highly efficient. It provides you the lowest lifetime energy cost. This installation manual contains information concerning important procedures and features of Fortress Power Lithium batteries.
Can a charge controller drain a fortress lithium battery?
The charge controllers and inverter monitoring systemscan drain the Fortress Lithium Batteries over an extended period when the entire system is not fully operational due to the electrical draw of the system components.
What is a fortress high-performance lithium battery?
Fortress High-performance Lithium Batteries aremanufactured at the highest quality standard. It comes with large power capacity and a fast charging and continuous discharge power. The proprietary architecture and BMS eliminate the need for cooling or ventilation, which creates an efficient round-trip conversion.
Do not expose battery to high temperatures. Fortress Lithium Batteries should be storedout of direct sunlight under the following temperature conditions. Systems should be put into storage at 60% SOC and checked monthly to ensure the system SOC does not fall below 20%. At 20% SOC the battery will self-discharge in approximately 2 months.
Can a fortress lithium battery be connected in parallel?
Fortress Lithium Batteries with the same capacity may be connected in parallel forup to 2 units only. All wires should be an appropriate gauge and constructed to handle the loads that will be placed upon it. Heavy gauge, high strand copper wire is the industry standard due to its stability, efficiency and overall quality.
GRID TIED SYSTEMS: Once the Fortress Lithium Battery has been installed,turn on the entire system to test. Once testing has been completed, please disconnect the batteries from the load center until your local Utility Inspector is ready to turn on the entire system.